Fall 2024 JFK Testing & Information
Information and results related to sampling conducted in the JFK Library in Fall 2024.
December 10, 2024 – JFK Meeting Document
Tape Sampling Results
- EH&S collected 21 tape samples from 7 locations in JFK Library.
Air Particle Loading Results
- Particle sampling conducted by EH&S using Lighthouse particle counter.
Air Quality Sampling Results
- Air quality sampling results from 11 sites in and around JFK Library.
Information for Building Occupants
To request a HEPA filter or other assistance from EH&S, please use the Service Request form.
To report a safety concern, please use the Incident Report form or the Visitor Incident Report form. You may also use the Safety Concern Report form.
2018-2019 JFK Library Test Results and Related Information
Information and results related to sampling conducted in the JFK Library in 2018 and 2019.
Tests Before June 2018 Library Cleaning
- 1/31/18 Air Particulate Sampling Results from L23, M04 suite, and U02 suite
- 1/31/18 Tape Lift Results from L23, M02, M04, and U02
- 2/1/18 Tape Lift Results from M04 suite and U02 suite
- 2/1/18 and 2/27/18 Tape Lift Results from U12 suite
- 2/27/18 Dust Sampling Results for Mite Frass in M04 suite, M23, U02 suite, and U12A & B
- 2/27/18 Mold Growth Results from two books in U12
- 3/1/18 Dust Sampling Results for Mite Frass in L03, L23, M18, and U04
- 3/1/18 and 3/2/18 Tape Lift Results from L03, L07, L23, M14, M18, U04, U08, U12A, and U18
- 3/22/18 Tape Lift Results from U02 suite
- 3/28/18 Air Particulate Sampling Results
- 4/19/18 Tape Lift Results from M04 suite and U02 suite
- 4/30/18 and 5/2/18 Air Particulate Sampling Results
- 5/7/18 Tape Lift Results from L03, L23, L37, M18, M20, and the central area on the main floor
- 5/9/18 Air Particulate Sampling Results
- 5/9/18 Spore Trap Results from L23, Reference desk, Back exit, and Roof
- 5/13/18 Tape Lift Results from M22, M23 suite, M26, and M28
Tests After June 2018 Library Cleaning
- 7/9/18 Tape Lift Results from all floors
- 7/12/18 HVAC Performance Review
- 8/18/18 – 8/23/18 Air Particulate Sampling Results in M04E
- 8/23/18 Tape Lift Results from Microlab Northwest, LLC
- 9/11/18 Indoor Air Quality Review Report by Terracon Consultants
- 10/18/18 Indoor VOC sampling (all floors and main building air intakes)
- 10/18/18 Air particulate sampling (all floors and main building air intakes)
- 10/24/18 Air particulate sampling (all floors and main building air intakes)
- 10/17/18 Air Particulate Sampling (Atrium, M04 and M23)
- 10/29/18 Air Particulate Sampling (lower level, 1st and 2nd Floor)
- 11/2/18 Air Particulate Sampling (M23, M04 and U02)
- 11/2/18 Particle Counts
- 11/8/18 IAQ Commercial Survey by Prism Analytical Technologies in M04
- 11/8/18 IAQ Commercial Survey by Prism Analytical Technologies in M23
- 11/8/18 IAQ Commercial Survey by Prism Analytical Technologies in U02
- 11/3/18 Tape Lift Results from all floors
- 11/15/18 Formaldehyde Sampling
- 11/15/18 Particle Counts
- 12/5/18 Air-O-Cell Sampling
- 12/6/18 Air-O-Cell Sampling
- 12/5/18 VOC and MVOC Sampling
- 12/6/18 VOC and MVOC Sampling
- 12/7/18 Formaldehyde Sampling
- 12/6&7/18 Particle Counts
- 1/4/19 Air-O-Cell Sampling
- 1/4/19 Formaldehyde Sampling
- 1/4/19 Air Particulate Sampling
- JFK M04D Formaldehyde 03-25-19
- JFK M04E Formaldehyde 03-19-19
- JFK M23 Formaldehyde 03-19-19
- JFK U02A Formaldehyde 03-19-19
- JFK U02C Voc’s 03-14-19
- JFK U06 Voc’s 03-14-19
- JFK U08 Formaldehyde 03-14-19
- JFK U08 Formaldehyde 03-27-19
- JFK U08 Formaldehyde 3-29-19 0830
- JFK U08 Formaldehyde 3-29-19 1630
- JFK U04 Formaldehyde 3-29-19
- JFK U06 Formaldehyde 4-16-19
- JFK L23 Temperature, relative humidity, and C02 levels 3/25/19 to 4/5/19
- JFK L37 Temperature, relative humidity, and C02 levels 3/12&13/19
- JFK M04 Suite Temperature, relative humidity, and C02 levels 3/14/19 to 4/20/19
- JFK M23 Suite Temperature, relative humidity, and C02 levels 3/13/19 to 4/17/19
- JFK U02 Suite Temperature, relative humidity, and C02 levels 4/15/19 to 4/20/19
- JFK U06 Temperature, relative humidity, and C02 levels 4/8/19 to 4/17/19
- JFK U12K Temperature, relative humidity, and C02 levels 4/8/19 to 4/17/19
- JFK Ceiling Tile Metal Content Test Results by TestAmerica Analytical Report 3/28/19
- JFK L23 Qualitative VOC Indicator Charts 3/28/19 to 4/2/19
- JFK M04E Qualitative VOC Indicator Charts 3/25/19 to 3/29/19
- JFK M23A Qualitative VOC Indicator Charts 4/23/19 to 4/26/19
- JFK M23D Qualitative VOC Indicator Charts 4/8/19 to 4/17/19
- JFK U02C Qualitative VOC Indicator Charts 4/15/19 to 4/20/19
- JFK U08 Qualitative VOC Indicator Charts 3/14/19 to 3/23/19
- JFK L23 Airborne Particulate Loading Charts 3/28 & 3/29/19
- JFK M04E Airborne Particulate Loading Charts 3/25/19 to 3/27/19
- JFK M23A Airborne Particulate Loading Charts 4/23/19 to 4/25/19
- JFK U08 Airborne Particulate Loading Charts 3/14/19 to 3/19/19
- JFK M04 Expanded VOC Analysis 4/10/19
- JFK U02 Ozone 5/8/19
- JFK U02 Airborne Particulate Loading Charts 5/8/29 to 5/9/19
- JFK Analytical Results for Airborne Irritant Metal Dusts
- JFK Analytical Results for Airborne Irritant Metal Dusts 5/6/19
- JFK M04E Breathable Nitrogen Oxides 5/16/19
- JFK U12K Breathable Nitrogen Oxides 5/21/19
- JFK M23D Ambient Breathable Ozone 5/16/19
- JFK U12K Ambient Breathable Ozone 5/22/19
- JFK 4/25/19 Tape Lift Results
- JFK 4/30/19 Tape Lift Results
- JFK 4/16/19 Tape Lift Results
- JFK 4/17/19 Tape Lift Results
- JFK 3/8/19 & 3/13/19 Tape Lift Results
- JFK 4/03/19 Tape Lift Results
- JFK 4/12/19 Tape Lift Results
- JFK 3/22/19 & 3/25/19 Tape Lift Result
- JFK 7/30/19 lower level Tape Lift Result
- JFK 7/30/19 mid level page 1&2 Tape lift results
- JFK 7/30/19 upper level Tape lift results
- JFK 8/30/19 Follow-up tape lift for M23C & M23D