Well 2R Equipping Project – AE1345G3

<a href="https://inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Refurbishing of well #2R and replacement of domestic water system pump.  Public Works Contract. Total Budget: $7,066,000 Current Project Phase: Phase Design Consultant: TD&H – Spokane, WA General Contractor: Blue Star Enterprises Northwest, Inc EWU Contact: Mike DavisConstruction Project Managerphone: 509.359.7353email: mdavis@ewu.edu RFQ/Bid Information: … Read more

Tawanka Dining Hall Entry – AE1409

<a href="https://inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: *scope Total Budget: $budget Current Project Phase: Phase Design Consultant: Madsen Mitchell Evenson & Conrad – Spokane, WA General Contractor: EWU Contact: Mike DavisConstruction Project Managerphone: 509.359.7353email: mdavis@ewu.edu RFQ/Bid Information: Bid (Quest Project #) Bid Advertisement Bid Tab – available on QuestCDN 

Huston Hall HVAC – AE1473

<a href="https://inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Consultant to recommission and balance HVAC system to reduce noise and improve temperature controls. Total Budget: $88,000 Current Project Phase: Phase Design Consultant: Dumais Romans EWU Contact: Jim MoellerSenior Project Managerphone: 509.359.6565email: jmoeller@ewu.edu RFQ/Bid Information: Bid (Quest Project #) Bid Advertisement Bid Tab – … Read more

Electric Charging Stations – AE1479

<a href="https://inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Install electric car charging stations at the EWU Visitors Center (2 each) and Computer Engineering Building (two each). Total Budget: $budget Current Project Phase: Completed Design Consultant: NAC Architecture – Spokane, WA EWU Contact: Steve Schmedding Senior Project Manager – Facilities Engineer phone: 509.359.4205 … Read more

Cheney Hall Plastics & Fluids Lab Design – AE1433

<a href="https://inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Design and construction of new lab space for Plastics and Fluids instruction for the College of Science Technology Engineering and Math. This includes new HVAC, electrical, plumbing, and renovation of the spaces. Cheney Hall room 118 will be constructed to hold the lab. Total … Read more