Chiller Plant Loading Dock Addition – AE1484G3

<a href="https://inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: New loading area to accept the new chillers that are a part of the Chilled Water Upgrade Project.  This area will house electrical switch gear needed for the chillers along with a large access door and slab to install the chillers next fall. Total … Read more

STA Bus Routing – AE1550

<a href="https://inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Planning and implementation of bus route location due to changes in the PUB project. Total Budget: $30,000 Current Project Phase: Planning Design Consultant: TD&H Engineering – Spokane, WA EWU Contact: Stephen SchmeddingSenior Project Manager – Facilities Engineerphone: 509.359.4205email: sschmedding@ewu.edu

Pavilion Ceiling and Lighting Study – Reese Court (PAV) – AE1528

<a href="https://inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Light Fixtures at Reese Court are failing difficult to access.  Consultant to review with recommendation for new lighting fixtures. Total Budget: $12,000 Current Project Phase: Design Design Consultant: Bernardo Wills Architects EWU Contact: Steve SchmeddingSenior Project Manager – Facilities Engineerphone: 509.359.4205email: sschmedding@ewu.edu RFQ/Bid Information: … Read more

Water Reservoir Recoating Project – AE1345G4

<a href=”https://inside.ewu.edu/facilities/news/projects/” title=” < return to projects page Scope of Work: *scope info Total Budget: $7,066,000 Current Project Phase: Phase Design Consultant: TD&H – Spokane General Contractor: S & L Underground, Inc. EWU Contact: Steve Schmedding Senior Project Manager – Facilities Engineer phone: 509.359.4205 email: sschmedding@ewu.edu RFQ/Bid Information: Bid (Quest Project #4349285) Bid Advertisement Bid … Read more

Water Distribution Improvements – AE1345G5

<a href="https://inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Work of the Project includes construction of new and replacement water distribution mains within the existing campus water system, restoration of surface improvements, and other related items.. Total Budget: $7,066,000 Current Project Phase: Phase Design Consultant: TD&H – Spokane General Contractor: S & L … Read more

Chilled Water Capacity Upgrade – AE1484

<a href="https://inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Project is to design and construct new chilled water supply and primary electrical for the new Interdisciplinary Science Center.  Currently funded for design only. Total Budget: $4,830,000 Current Project Phase: Design Design Consultant: MSI Engineering, (Meulink Stauffenberg, Inc.), Spokane, WA General Contractor: EWU Contact: … Read more