Gym Floor Refinish 16′ – AE1546

<a href=”https://inside.ewu.edu/facilities/news/projects/” title=” < return to projects page Scope of Work: The following court surfaces are to be refinished with the following Mid- American Research Chemical products. No product substitutions will be allowed. court surfaces Reese Court: 18,297 sq ft (2 coats MARC Full Court Finish 289) Gym 264: 7616 sq ft (2 coats MARC … Read more

Pavilion Ceiling and Lighting Study – Reese Court (PAV) – AE1528

<a href="https://inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Light Fixtures at Reese Court are failing difficult to access.  Consultant to review with recommendation for new lighting fixtures. Total Budget: $12,000 Current Project Phase: Design Design Consultant: Bernardo Wills Architects EWU Contact: Steve SchmeddingSenior Project Manager – Facilities Engineerphone: 509.359.4205email: sschmedding@ewu.edu RFQ/Bid Information: … Read more

Gym Floor Refinish 15′- AE1459

<a href=”https://inside.ewu.edu/facilities/news/projects/” title=” < return to projects page Scope of Work: The following court surfaces are to be refinished with the following Mid-American Research Chemical products. No product substitutions will be allowed. Total Budget: $budget Current Project Phase: phase General Contractor Superior Floor Refinishing – Colbert, WA EWU Contact: Mike Davis Construction Project Manager phone: … Read more