BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Facilities and Planning - ECPv5.15.0.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Facilities and Planning
X-ORIGINAL-URL:https://inside.ewu.edu/facilities
X-WR-CALDESC:Events for Facilities and Planning
BEGIN:VTIMEZONE
TZID:America/Los_Angeles
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20190310T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20191103T090000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Los_Angeles:20190920T150000
DTEND;TZID=America/Los_Angeles:20190920T150000
DTSTAMP:20260416T233337
CREATED:20190906T170501Z
LAST-MODIFIED:20190906T170501Z
UID:2923-1568991600-1568991600@inside.ewu.edu
SUMMARY:CP1056 – Rozell Central Energy Plant: Install New Boiler – Engineering/Architectural Design and Construction Phase Services – RFQ
DESCRIPTION:Request for Qualifications – Engineering/Architectural Design and Construction Phase Services \nVisit Questcdn.com. Enter Project Number #6504231 into the Project Number search field. \n\nBy downloading the free project advertisement\, you will be added to the plan holders list which ensures automatic project updates\, notifications and award results.\n\n  \nProject: \nThis project will replace aged existing boiler(s) and increase EWU’s campus steam capacity to meet future heating needs in support of the current capital master plan\, provide sufficient redundancy during scheduled maintenance operations\, and to increase operating efficiencies.  The existing campus heating system is comprised of five boilers that initially provided a total capacity of one hundred thirty four thousand (134\,000pph) pounds per hour.  One boiler has been removed from the train\, thus reducing capacity to 116\,000pph.  Historical records indicate a peak heating load of about seventy five thousand (75\,000pph) has been experienced at the plant.  Based on the anticipated master plan growth\, the increased heat load is expected to be approximately 34%\, or around 100\,000pph.  The addition of approximately 40\,000pph heating capacity is needed to serve the campus into the future. \n  \nScope of Service: \nThe University is seeking proposals from qualified Mechanical Engineering firms.  Applicants should only include information in their proposals pertaining to their own firm’s Design and Construction Administration experience and qualifications.  Do not add information for any sub-consultants that may be considered for this project.  Sub-consultants will be chosen at the discretion of the selected consultant with the owners approval. \n  \nSubmittal Requirements: \nSubmittals must be received at the Construction and Planning Services Office\, 1115 Cedar St\, Rozell Plant\, Eastern Washington University\, Cheney\, WA 99004-2464\, by 3:00 p.m.\, Friday\, September 20\, 2019. \nConsultant selection will be based on EWU’s established procedures. To be considered for selection\, prospective consultants are to provide: \n\nProvide five (5) copies and one (1) electronic .pdf on CD or thumb drive containing;\n\nCover letter; sub-sections addressing the four criteria for selection which are\n\n(a) Qualifications of Key Personnel\,\n(b) Relevant Experience\,\n(c) Performance on Previous Projects\,\n(d) Firm’s Ability to Perform Requested Services;\nCompleted Federal Standard Form 330.\n\n\n\n\nPlease be concise and do not include information that does not pertain/relate to this project\n\n  \nSelection Process: \nVoluntary MWBE goals of 10% minority\, 6% women\, and 5% WA small business and 5% veteran-owned business have been established for this project. Achievement of the goals is encouraged. However\, no minimum level of MWBE participation is required and such goals will not be used as a criterion for selecting contractors. EWU is an affirmative action employer. \nA/E Selection procedures are available on the EWU website for Construction and Planning Services at:http://access.ewu.edu/facilities/depts/cp/request-for-qualifications \nEWU reserves the right to continue with the consultant selected or has the option to conduct a new consultant selection process for future services beyond those advertised above. \n  \nProposed RFQ Timeline: \n\nSubmittal deadline:\n\n3:00 p.m.\, September 20\, 2019\n\n\nEvaluation:\n\nSeptember 23\, 2019 to October 7\, 2019\n\n\nFinalist Notification:\n\nOctober 9\, 2019\n\n\nInterview scheduled:\n\nOctober 21st to October 24th\, 2019\n\n\nAward:\n\nNovember 8\, 2019\n\n\nNotice to Proceed:\n\nMid December\, 2019\n\n\n\n  \nEWU Contacts: \nFor additional information\, contact EWU Construction & Planning: Steve Schmedding\, P.E.\, Facilities Engineer\, Sr. PM\, at (509) 359-4205 or Jacque Early\, Admin Specialist (509) 359-6746.
URL:https://inside.ewu.edu/facilities/event/cp1056-rozell-central-energy-plant-install-new-boiler-engineering-architectural-design-and-construction-phase-services-rfq/
LOCATION:Rozell Conference Room\, 1115 Cedar Street\, Cheney\, WA\, 99004\, United States
CATEGORIES:RFQ
GEO:47.4941125;-117.5857403
X-APPLE-STRUCTURED-LOCATION;VALUE=URI;X-ADDRESS=Rozell Conference Room 1115 Cedar Street Cheney WA 99004 United States;X-APPLE-RADIUS=500;X-TITLE=1115 Cedar Street:geo:-117.5857403,47.4941125