BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Facilities and Planning - ECPv5.15.0.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Facilities and Planning
X-ORIGINAL-URL:https://inside.ewu.edu/facilities
X-WR-CALDESC:Events for Facilities and Planning
BEGIN:VTIMEZONE
TZID:America/Los_Angeles
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20190310T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20191103T090000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Los_Angeles:20190920T150000
DTEND;TZID=America/Los_Angeles:20190920T150000
DTSTAMP:20260424T073500
CREATED:20190906T162616Z
LAST-MODIFIED:20190906T162616Z
UID:2921-1568991600-1568991600@inside.ewu.edu
SUMMARY:CP1057 - Campus Electrical Distribution System: Incremental Medium-Voltage Conductor and Vacuum Switch Replacement – Engineering/Architectural Design and Construction Phase Services - RFQ
DESCRIPTION:Request for Qualifications – Engineering/Architectural Design and Construction Phase Services – Campus Electrical Distribution System: Incremental Medium-Voltage Conductor and Vacuum Switch Replacement\nVisit Questcdn.com. Enter Project Number #6504252 into the Project Number search field.\n\nBy downloading the free project advertisement\, you will be added to the plan holders list which ensures automatic project updates\, notifications and award results.\n\nProject: \nThis project will\, at a minimum\, replace a portion of the campus 15-kV primary feeder network conductors and vacuum switches. Replacement of aged 15-kV conductors and below grade switches is intended to increase system reliability\, operational safety and distribution system flexibility. \n  \nScope of Service:  \nThe University is seeking proposals from qualified Electrical Engineering firms.  Applicants should only include information in their proposals pertaining to their own firm’s Design and Construction Administration experience and qualifications.  Do not add information for any sub-consultants that may be considered for this project.  Sub-consultants will be chosen at the discretion of the selected consultant with the owners approval. \n  \nSubmittal Requirements: \nSubmittals must be received at the Construction and Planning Services Office\, 1115 Cedar St\, Rozell Plant\, Eastern Washington University\, Cheney\, WA 99004-2464\, by 3:00 p.m.\, Friday\, September 20\, 2019. \nConsultant selection will be based on EWU’s established procedures. To be considered for selection\, prospective consultants are to provide: \n\nProvide five (5) copies and one (1) electronic .pdf on CD or thumb drive containing;\n\nCover letter; sub-sections addressing the four criteria for selection which are\n\n(a) Qualifications of Key Personnel\,\n(b) Relevant Experience\,\n(c) Performance on Previous Projects\,\n(d) Firm’s Ability to Perform Requested Services;\nCompleted Federal Standard Form 330.\n\n\n\n\nPlease be concise and do not include information that does not pertain/relate to this project\n\nSelection Process: \nVoluntary MWBE goals of 10% minority\, 6% women\, and 5% WA small business and 5% veteran-owned business have been established for this project. Achievement of the goals is encouraged. However\, no minimum level of MWBE participation is required and such goals will not be used as a criterion for selecting contractors. EWU is an affirmative action employer. \nA/E Selection procedures are available on the EWU website for Construction and Planning Services at:http://access.ewu.edu/facilities/depts/cp/request-for-qualifications \nEWU reserves the right to continue with the consultant selected or has the option to conduct a new consultant selection process for future services beyond those advertised above. \n  \nProposed RFQ Timeline: \n\nSubmittal deadline:\n\n3:00 p.m.\, September 20\, 2019\n\n\nEvaluation:\n\nSeptember 23\, 2019 to October 7\, 2019\n\n\nFinalist Notification:\n\nOctober 9\, 2019\n\n\nInterview scheduled:\n\nOctober 21st to October 24th\, 2019\n\n\nAward:\n\nNovember 8\, 2019\n\n\nNotice to Proceed:\n\nMid December\, 2019\n\n\n\n  \nEWU Contacts: \nFor additional information\, contact EWU Construction & Planning: Steve Schmedding\, P.E.\, Facilities Engineer\, Sr. PM\, at (509) 359-4205 or Jacque Early\, Admin Specialist (509) 359-6746.
URL:https://inside.ewu.edu/facilities/event/campus-electrical-distribution-system-incremental-medium-voltage-conductor-and-vacuum-switch-replacement-engineering-architectural-design-and-construction-phase-services-rfq/
LOCATION:Rozell Conference Room\, 1115 Cedar Street\, Cheney\, WA\, 99004\, United States
CATEGORIES:RFQ
GEO:47.4941125;-117.5857403
X-APPLE-STRUCTURED-LOCATION;VALUE=URI;X-ADDRESS=Rozell Conference Room 1115 Cedar Street Cheney WA 99004 United States;X-APPLE-RADIUS=500;X-TITLE=1115 Cedar Street:geo:-117.5857403,47.4941125
END:VEVENT
END:VCALENDAR